| This job involved finish work after plumbers had installed
new pipes between and upstairs bathroom and the basement. It involved
2 1/2 sheets of work upstairs and 3 sheets on the first floor in
the kitchen. Walls were stripped of plaster and lath, studs were
furred out, and prepared for new drywall. Small doors were installed
to provide access for inline shutoff valves. In these pictures the
first coat of mud is being applied. |