March 18, 2001


Sheeting the roof of the back porch.
Upstairs shower stall, and toilet area.

Upstairs insulated and wired.

Wires coming down from upstairs.

New furnace, high efficiency, no chimney. Small plastic pipe vents CO2. The furnace was working - all duct work in except for two runs.

Don checking the electrical guide.